Design and Planning
The project began with an in-depth consultation to understand the client's space, lifestyle needs, and budget. Our design team focused on creating a bespoke pool that would fit perfectly within the villa's footprint whilst maximising usable swimming area. Detailed 3D renderings and technical specifications were provided to refine the design before manufacturing.
Installation
The installation was completed in 8 weeks with just 15 working days on-site, minimising disruption to the family's daily life. The one-piece GRP pool shell was manufactured in our Dubai facility to exact specifications, then delivered and installed with precision. High-efficiency climate control systems were fitted to ensure year-round comfortable swimming at just 2 AED per hour running cost.
Engineering & Materials
Purpose-built GRP construction was engineered specifically for UAE conditions: 50°C+ temperatures, high saline water, and sandy soil movement. The hand-tiled ceramic mosaic finish was chosen for durability and aesthetic appeal, creating a stunning poolscape that complements the villa's architecture.
Warranty & Support
Post-installation, the client received complete equipment training and water chemistry guidance. Our 10-year leak-free warranty provides genuine peace of mind, backed by a registered Dubai company. The homeowner has direct contact details for ongoing support, ensuring their pool remains a beautiful focal point of family life.



